Al-Mawali Al-Haramain Project - Jeddah
Field geotechnical study with foundation recommendations, concrete pour supervision, compaction and plate load testing.

Project Snapshot
For the Al-Mawali Al-Haramain project in Jeddah, TECHNO Soil Lab covered both foundation and execution phases — a field geotechnical study with foundation recommendations, plus concrete pour supervision, compaction, and plate load testing.
Scope of Work
From Borehole to Pour: Following the Project Through Two Phases
Al-Mawali Al-Haramain illustrates a common pattern for TECHNO Soil Lab on major construction projects: starting with a field geotechnical study that sets foundation recommendations before excavation, then returning for on-site concrete pour supervision during execution. This continuity between design and execution phases keeps engineering decisions consistent from the first borehole to the last pour, through compaction tests verifying backfill density and plate load tests confirming the bearing capacity of the prepared foundation layers.
Project Gallery

Related Articles
Related Projects
Have a project underway?
Talk to our field team about testing and quality assurance for your build.
Start your project with us