Completed Project

Hind Project - Jeddah

Concrete pour quality supervision, mix quality verification, temperature and slump measurement.

Hind Project - Jeddah

Project Snapshot

For the Hind project in Jeddah, TECHNO Soil Lab supervised concrete pour quality on site, verifying the mix's operational quality and measuring temperature and slump on every visit.

Scope of Work

Why Concrete Slump Is Measured on Every Site Visit

The slump test is the first check run when a concrete mixer arrives on site, because it immediately reveals whether the mix's workability suits pouring — an overly dry mix risks air voids, while an overly wet one weakens final compressive strength. At Hind Project in Jeddah, slump measurement was paired with mix temperature checks on every site visit, controlling pour conditions before work began and ensuring consistent quality across every concrete batch reaching the site.

Project Gallery

Hind Project - Jeddah — 1
Hind Project - Jeddah — 2
Hind Project - Jeddah — 3

Related Articles

Related Projects

Have a project underway?

Talk to our field team about testing and quality assurance for your build.

Start your project with us