Al-Qurashi Mosque - Wali Al-Ahd District, Makkah
Field quality monitoring and technical supervision of structural concrete pours.

Project Snapshot
During structural concrete pours for Al-Qurashi Mosque in the Wali Al-Ahd district, TECHNO Soil Lab's field team monitored quality at every pour stage to confirm the structural work met required specifications.
Scope of Work
On-Site Pour Monitoring for Religious Facility Projects
Mosque projects carry strict quality and structural safety requirements, like any public facility serving large numbers of worshippers. At Al-Qurashi Mosque in the Wali Al-Ahd district, TECHNO Soil Lab monitored every concrete pour on-site — from checking mix workability before pouring to sampling concrete cubes for compressive strength testing at 7 and 28 days — ensuring the load-bearing structural elements, columns and roof slabs, met accredited specifications before finishing work proceeded.
Project Gallery

Related Articles
Related Projects
Have a project underway?
Talk to our field team about testing and quality assurance for your build.
Start your project with us