Completed Project

Main Sewage Transmission Line - Al-Jumum

Nuclear-method asphalt compaction monitoring after re-paving works along the sewage line route.

Main Sewage Transmission Line - Al-Jumum

Project Snapshot

For the main sewage transmission line on the old road in Al-Jumum, TECHNO Soil Lab monitored asphalt compaction using the nuclear method after re-paving, confirming results against approved specifications.

Scope of Work

Nuclear Density Measurement for Asphalt Compaction After Paving

After repaving the road above the main sewage line in Al-Jumum, visual inspection alone can't confirm whether the new asphalt layer is compacted enough to bear traffic loads. A nuclear density gauge gives an instant reading of the layer's in-situ density without waiting for lab results, letting the contractor confirm compaction meets spec before leaving the site — critical for road projects repaved over prior excavation work like sewage lines.

Project Gallery

Main Sewage Transmission Line - Al-Jumum

Related Articles

Related Projects

Have a project underway?

Talk to our field team about testing and quality assurance for your build.

Start your project with us