Main Sewage Transmission Line - Al-Jumum
Nuclear-method asphalt compaction monitoring after re-paving works along the sewage line route.

Project Snapshot
For the main sewage transmission line on the old road in Al-Jumum, TECHNO Soil Lab monitored asphalt compaction using the nuclear method after re-paving, confirming results against approved specifications.
Scope of Work
Nuclear Density Measurement for Asphalt Compaction After Paving
After repaving the road above the main sewage line in Al-Jumum, visual inspection alone can't confirm whether the new asphalt layer is compacted enough to bear traffic loads. A nuclear density gauge gives an instant reading of the layer's in-situ density without waiting for lab results, letting the contractor confirm compaction meets spec before leaving the site — critical for road projects repaved over prior excavation work like sewage lines.
Project Gallery

Related Articles
Related Projects
Have a project underway?
Talk to our field team about testing and quality assurance for your build.
Start your project with us