Completed Project

Underground High-Voltage Cable Extension - Makkah

Nuclear-method field density testing of backfill surrounding underground cables.

Underground High-Voltage Cable Extension - Makkah

Project Snapshot

For a high-voltage underground cable extension in Makkah for Mohammed Al-Ojaimi Contracting Establishment, TECHNO Soil Lab performed nuclear-gauge field density testing on the cable-surround backfill. The readings provided a field record of the backfill layers before final trench closure continued.

Scope of Work

Why Compaction Testing Is Required Around Underground Cables

Cable-trench backfill is concealed work that becomes difficult to inspect after closure. Field density testing was therefore performed on the backfill layers surrounding the cables on this Makkah project, documenting compaction while the construction team could still review the reading before moving to final backfilling.

A Documented Scope Without Assuming an Unrecorded Result

The project record states the verified scope: the Makkah location, Mohammed Al-Ojaimi Contracting Establishment as client, and nuclear-method field density testing around underground cables. It does not publish point counts or compaction percentages because those values are not present in the available content record and remain in the project's test reports.

Project Gallery

Underground High-Voltage Cable Extension - Makkah — 1
Underground High-Voltage Cable Extension - Makkah — 2

Related Articles

Related Projects

Have a project underway?

Talk to our field team about testing and quality assurance for your build.

Start your project with us