Laboratory Service

Soil Testing Laboratory, Boreholes & Site Tests in Qassim

A soil testing laboratory covering pre-construction boreholes, in-situ testing, sampling, laboratory analysis, and geotechnical reporting according to each project's scope.

Soil Testing Laboratory, Boreholes & Site Tests

Soil Testing in Qassim

A ground investigation in Qassim (Al-Qassim) should consider how the plot was used before development. This inland Najd agricultural region includes farms converted to building land, where former irrigation, levelling, or fill may influence local conditions. Sandy and silty soils vary, while gypsum- or salt-bearing layers can occur in some low areas. These are site questions, not assumptions for every town.

Land history informs the programme

The proposed structure, levels, former farm buildings, and known irrigation routes are reviewed before the consultant defines borehole positions and depths. Work may include logging, SPT, groundwater observations when encountered, and samples for grading, moisture, or Atterberg limits. Proctor and CBR can support earthworks, while chemistry may be added when salts are relevant.

Planning across separated towns

Our Qassim field team covers plots in Al Rass, Al Badayea, Riyadh Al Khabra, An Nabhaniyah, and Dariyah. On normal days, listed windows range from 5–20 minutes within Al Rass to 90–160 minutes for the outer region. Coordinates and equipment access are confirmed before longer journeys.

Send plot limits, building information, available levels, known fill, former agricultural use, buried services, and a stable equipment route. Samples receive identifiers at collection and follow the agreed laboratory workflow. The designer uses results with SBC, municipal requirements, and project conditions rather than transferring advice between plots.

Areas We Cover in Qassim

Our Qassim field team covers 15 towns and municipalities across five groups around Al Rass. Listed times are typical on normal days and may vary with roads, entry clearance, and site readiness.

Al Rass

≈ 5–20 min
1 districts · Show districts

Al Rass

Towns near Al Rass

≈ 25–45 min
4 districts · Show districts

Al Badayea, Al Khabra, Riyadh Al Khabra, Qasr Bin Aqil

Mid-range towns

≈ 40–70 min
4 districts · Show districts

Al Bukayriyah, Ad Dulaymiyah, An Nabhaniyah, Dukhnah

Far towns

≈ 70–120 min
4 districts · Show districts

Al Quwarah, Al Fuwarah, Az Zahiriyah, Dulay Rashid

Outer region

≈ 90–160 min
2 districts · Show districts

Uqlat As Suqur, Dariyah

Estimated driving times from the lab on normal days; they can be longer during Ramadan and the Hajj season.

In Short

A soil testing laboratory investigates the ground before foundation design through boreholes, field measurements, and laboratory analysis. The work starts with a site-specific investigation plan and sampling, then documents the soil profile, test results, and geotechnical recommendations the structural designer needs for the project.

What Does a Soil Testing Lab Do Before Foundation Design?

Before a single cubic meter of concrete is poured, you need to know exactly what you're building on: solid rock, loose uncompacted fill, or collapsible soil that settles when saturated. Soil testing answers that question directly — by drilling boreholes to a depth matched to the building's size, sampling every layer, and running lab analysis to establish safe bearing capacity and groundwater level.

The geotechnical report turns subsurface conditions into usable design information instead of general assumptions. TECHNO Soil Lab's head office is in Ash Shara'i, Makkah, and its field teams cover projects in Makkah, Jeddah, Madinah, Riyadh and Qassim according to project scope and scheduling.

Precise, numbers-based bearing capacity instead of rough estimates
Avoid costly redesign or reinforcement after soil issues surface mid-construction
Clear results and recommendations for the designer, consultant, and requesting authority
Early detection of collapsible or saline soil risk before committing to a structural design

In-Situ and Laboratory Soil Testing

Soil investigation is not one test. The engineer selects a program that combines site observations with sample results for the structure type and project stage.

Field Tests and Boreholes

These record in-place conditions and changes with depth before samples move to the laboratory.

Borehole drilling, soil logging, and groundwater observations when encountered
Standard Penetration Testing (SPT) within boreholes
Disturbed and undisturbed sampling as the analysis requires
Field density and plate-load testing when required by the project

Laboratory Soil Tests

The soil laboratory classifies samples and measures their engineering behavior under the selected program.

Grain-size distribution, hydrometer analysis, and moisture content
Atterberg limits for fine and cohesive soils
Proctor testing for dry density and optimum moisture
CBR and additional tests selected for the site's intended use

Standards Soil Testing Is Measured Against

Every borehole and lab test at TECHNO Soil Lab follows a specific international standard — not an ad-hoc procedure.

SBC 303

Saudi Building Code — requires a geotechnical investigation scoped to the project type and site conditions

ASTM D1586

Standard Penetration Test (SPT) for soil density/consistency at depth

ASTM D6913 / D7928

Sieve and sedimentation grain-size analysis for soil classification; D6913 replaces withdrawn D422

ASTM D4318

Atterberg limits — liquid and plastic limit for cohesive soils

ASTM D1557

Modified Proctor for maximum dry density and optimum moisture in fill

ASTM D1883

California Bearing Ratio (CBR) for pavement and road layer design

From First Call to Final Report

Five connected stages, with the scope of each tailored to the site and project.

1

1. Site Visit & Borehole Count

Our team surveys the site and determines the required number of boreholes based on plot area and planned building type (residential, commercial, tower), per SBC 303 §18.

2

2. Drilling & Sampling

Boreholes are drilled to the specified depth, with SPT at regular depth intervals set by the borehole program and soil layers (often about 1.5 m), and suitable samples taken from each layer.

3

3. Lab Analysis

Samples move to our Makkah lab for grain-size, Atterberg limits, Proctor, and CBR analysis as the project requires.

4

4. Bearing Capacity Calculation

The geotechnical engineer analyzes SPT data and lab results to calculate safe bearing capacity and recommend a foundation type (isolated, raft, or piles).

5

5. Report Issuance

The site description, borehole logs, test results, calculations, and recommendations are compiled in one report. The delivery schedule is stated in the quotation after the borehole count, depths, and test program are reviewed.

Included Tests

16 field and laboratory tests available by project scope

Standard soil sampling from site

أخذ عينة من الردميات بالطريقة القياسية

ASTM D1452

Unit: sample

Sieve Analysis

التدرج الحبيبي

ASTM D6913 / D7928

Unit: sample

Fines passing #200 sieve (0.075 μm)

المواد الناعمة المارة من منخل #200

ASTM D1140

Unit: sample

Atterberg Limits (LL & PL)

حدود أتربرج (السيولة واللدونة)

ASTM D4318

Unit: sample

Modified Proctor

البروكتور المعدل

ASTM D1557

Unit: sample

California Bearing Ratio — CBR (3 molds)

نسبة التحمل كاليفورنيا (3 قوالب)

ASTM D1883

Unit: sample

Field Density — Sand Cone (min 5 pts/visit)

الكثافة الحقلية بالمخروط الرملي (5 نقاط/زيارة)

ASTM D1556

Unit: point

Field Density — Nuclear Method (5 pts/visit)

الكثافة الحقلية بالطريقة النووية (5 نقاط/زيارة)

ASTM D6938 / AASHTO T310

Unit: point

Thermal Conductivity

التوصيلية الحرارية للتربة

Unit: test

Thermal Resistivity

المقاومة الحرارية للتربة

Unit: test

Los Angeles Abrasion

مقاومة التآكل — لوس أنجلوس

ASTM C131

Unit: sample

Hydrometer Analysis

الهيدرومتر للمواد الطينية

ASTM D7928

Unit: sample

Moisture Content %

محتوى الماء

ASTM D2216

Unit: sample

Relative Density (sandy soil)

الكثافة النسبية للتربة الرملية

ASTM D4253 / D4254

Unit: test

Plate Load Test (P.L.T)

قرص التحميل

BS 1377-9 / ASTM D1194

Unit: test

Slab Load Test

تحميل السقف

Unit: test

Equipment used for this service

Why Choose Us

Why TECHNO Soil Lab?

16
Available Tests

Field and laboratory tests selected to match the project scope

15+
Years Experience

Accumulated technical experience in testing & engineering consultancy

5
Cities Served

Head office in Makkah, with equipped field teams in all five cities

The complete Soil Testing Laboratory, Boreholes & Site Tests guide

Test selection by project type, the pre-contract checklist, what drives the quote and what the report contains — on the main service page.

Read the full guide

Projects Where We Ran This Service

Related Reading

Common Questions

FAQ About Soil Testing Laboratory, Boreholes & Site Tests

On normal days, typical arrival starts at 5–20 minutes within Al Rass, then 25–45 minutes for nearby towns, and reaches 90–160 minutes for the outer region. These estimates vary with roads, entry clearance, and site readiness.

Other Services You May Need

Explore the rest of our accredited engineering tests in one place

Need Soil Testing Laboratory, Boreholes & Site Tests Services?

Our specialized team is ready to mobilize to your site anywhere in the Kingdom.